Show AT Thu MAJESTIC IMI s With Wit Ii Develop theft Work ork This The Th 1 Times giVe elve tho following concerning the progress of development nt at the tho properties prop e rile of ot the Majestic Cop Copper coPer Copper per er company c lUpan i it I At t the the ni nw v gas Hn hoist Is In operation p ant and the working wot has lias reached a II depth ot of feet feel where a large targe station Is III being cut am and from which point a 1 will b brun be berun berun run to the vein The new ne shaft house e ehas has been beell made mado large enough to module mod at u a plant for Cor electric or air drills At the the main working shaft Is down over OVel 00 feet teet am and within a tn fe days das will wl be connected with the shaft shott on oil the tho level lerel Much good tire ore has ha b been n opened up on art this level At the Joiner dome shaft which has now reached n a depth of or 23 feet leet the gasoline liaise hoist hol 1 formerly used at the thu Old Hickory soon noun be b Installed In Th Plic Old Hickory mine Is now itow lighted by electricity el the dynamo having been boen started up UI this Ihla week The Tho drills wilt wll be In use within a B few COI ow days das and they will te so I set Bet to work In the bottom of ot the shaft upon some of or the tho hardest harden I rock ever tackled by any uny mine The main shaft Is II now down lown OO feet U It Is going down In country rock rork but the tunnel the croscut and the i Wini that is being hIn sunk slink ink from ti i r u iio d u ti i r u iio d u the tunnel n level e are arc all l In good ore r A small email electric hoist holt Is 18 to be Installed at al althe atthe atthe the At the 0 O K Ie 1 the big pillows gallows frame 45 5 feet high has hu been erected this Meek eeR end and nd the new shaft house bouse hou Is I Ii about com completed The new working shaft hatt l Ia 18 nearly 00 feet teel deep and e ore are being run pull from tim old Incline shaft to con lon connect connect nert with this shaft on the die th and 00 leulu The northeast t on op the Is III still being baing driven ahead and has ha been In good ore for tor 90 GO G feet The electric plant for tor the th battery of ot five drills Is lIon on the ground round and will soon be beIn beIn bein In operation Thi equipment of ot all nil the now new shifts At the Majestic properties Includes self lIol dumping skips ll of or on ton tori capacity and large e ore bins to contain from ISO to 00 tons ton each will be built at t each cach shall shaft |