Show County COl to Get Full Power Load Front From Project Tentative allotments of Col- Col Colorado Colorado orado River Storage Project power give Uintah County the full load al applied for reported re- re reported ported Senator rank Frank E Moss Utah fl-Utah Monday The county allotments ough Moon Lake Electric As- As Association Association Inc are kil- kil kilowatts during the summer and kw during the winter THE DIVISION of the market mar mar- market ket year into summer and wInter was to best utilize the difference in requirements of the north and south divisions of the power marketing area First power production is expected in September and the first block of projects project I power will come from the initial generating unit at Fla- Fla Flaming Flaming ming Gorge Dam |