Show Presidents President's Budget Proposes 1 1 Million for Basin Projects President Kennedys Kennedy's budget proposals include more than 1 million for Uintah Basin developments Sen Frank E Moss Utah D-Utah Utah reported to The Vernal Express Monday The National Park Service was allocated to re- re reconstruct reconstruct construct Harpers Harper's Corner in Dinosaur National Monument ment A BUREAU of Land Man Man- Management warehouse was scheduled scheduled for construction at a acost acost cost of For the Bureau of Indian Affairs road program was earmarked for a power power- powerhouse house bridge for tor Uinta Canyon Road Hoad for Loop Road and for future surveys A total of was bud bud- budgeted budgeted for waterfowl habitat planning and development be- be below below low Flaming Gorge Dam SENATOR MOSS said that thata a acre development is un- un under under der consideration in the Browns Brown's Park area along the Green River The tract will be broken down into a acre 1300 marsh development 50 acres in waterfowl wa- wa waterfowl food production and the balance in riverbank habitat habitat tat and a buffer zone he said Also included in Flaming Gorge budget requests are for big game range range- rangeland land and acquisition and for its development and for access and for reservoir fishery investigations SENATOR MOSS said that new reservoirs are highly pro pro- productive productive He disclosed that the Bureau of Fisheries and Wild Wild- Wildlife Wildlife life will gather information on the effect of last years year's poisoning ot of trash fIsh and current conditions at the res- res reservoir reservoir so that detailed plans may be made to stock the wa- wa waters tens with game fish Senator Moss also reported that the proposed Jones Hole Bole Fish Hatchery plans are also progressing Fish reared In Inthis inthis this hatchery hatchery- will wUl supply the new Flaming Gorge Reser- Reser Reservoir Reservoir voir In fiscal year 1963 was appropriated for planning and surveys of the road which will connect connect with the road from Vernal and make the hatchery site at the bottom of the canyon accessible Estimated Estimated ed cost of the road is |