Show 1 I S 5 Environmental statement ready for Colorado oil shale development The Department of oC the Interior In tenor announced last week that tha thata t ta a Draft Environmental Statement EIS on federal to the proposed development of oC oil shale resources by the Colony Development Operation in Garfield Carfield County Colorado Isnow Isnow is isnow now available to the public TilE THE PROPOSAL involves construction of oC an oil shale plant complex an Interstate petroleum products pipeline a federal land exchange two power transmission lines and diversion of oC water from the Colorado River Written comments on the EIS will be accepted until February 14 and are being solicited from public agencies and Interested citizens Comments should be addressed to the Colorado State Stale Director Bureau Dureau of oC Land Management Room Colorado State flank Dank Building 1600 Broadway Denver Colorado Colado Information developed from Crom the written comments and public hearings will be used in preparing the final EIS PUBLIC HEARINGS are scheduled to be held in Moab January 27 In the Moab City Council Chambers C C Building 5 1 and 79 9 pm p.m. Grand Junction January 28 Inthe in inthe inthe the Federal Court Room Federal Building 5 1 and 9 7 pm pmj and Denver January 29 at Weyer Auditorium Denver Public Library 1357 Broadway 15 5 and to pm p.m. Copies of oC the draft EIS are available for Cor inspection in Inthe the Public Room Federal Building South State Salt Lake City and the Moab District Office 72 South Main M Moab ab To obtain copies of the draft EIS write the Colorado State Slate Director Office of oC Public Affairs Affairs Affairs Af Af- Af- Af fairs in Denver |