Show modern union high school building scheduled theduledfor for completion jul july oe1o oelo 21 july 21 Is set as date for com plecion pletlon pletion at of the new union high school one mile east of roosevelt 0 to enable equipment to 0 be moved in time for the new school year construction of the sewage system te Is s being delayed due to right g h t of way 1 difficulties A at t th the first meeting of the union unio bo board to be held at the new school henry P fetzer salt late lake city architect reported ret the 800000 600000 building t to be oftne bmt amt finest quality la in finish and structure in addition to SOO 500 student students from roosevelt and alterray aiterra alterra AI Al terra the new structure will bouse house 50 indian students for which the in dlan than service made a grant of 250000 supic supfc supt bupt forrest stone of pli duchesne indian service ex ez pressed hla his pride in fa he the beauty an and d design ofshe otthe ofthe new agh wgh high school cbool sehool Fir rlrtpreot firepro epro I 1 the school has ha reinforced concrete floors and roof with the exception of the gymnasium making it as airet firet alre flre resistant reristant ax as possible the 16m gyro has ha dim dlmenslona enslons of GO 00 by 100 feet anabas andbas and has a sliding partlon to make separate gyms for or boys and girls tele cop bleachers now are being installed led for an 1100 seating capacity halls are of glazed glued block wainscot with the north south hall 428 426 feet in length and the east west hall 218 feet drink ing fountains and trash receptacles are recessed into the wall abe tbe 7be building Is designed for ease in cleaning and maintain ing the rest rooms roonu roona having tile floors and a large part ofthe odthe walls sloped calling collings MIMIna eliminating ting acoustical difficulties som sometimes eumes present with the u usual su al parallel design of rooms room s are the modernistic dop loped cel ceilings cellings bellings lings in all claim cla3m classrooms rooms andhalls and san skn halls all are equipped with acoustic celotex 4 continued on page 8 UNION HIGH SCHOOL TO BE COMPLETED JULY 21 continued from page 1 outlie outlde outide walla walls are nearly complete class glass areas which illuminate the entire rooms the glan used is heat absorbing and diffusing wall ac acoustical cylinders have been installed in the music room to bring out the various tones and reduce vibration the school has modern modem chemistry and physics laboratories spectacular color and design of the home economics department is spectacular with stainless steel ceramic tile and linoleum being used in the cabinet sink and work areas the visual aids room has a floor and theater seats and is equipped with a lirojec projector A ne new 4 32 by 80 foot hot unch center with 2560 square of lunching pace space will be south9fthe south althe plthe high school tchool wa w 1 i I industrial arts and farm mechanics shops win will be housed in i a 50 x 80 foot structure an exceptionally fine library lias has been included principal principal of the new high chool school is loman IF hutchings previously revious ly principal of wasatch digh 3igh schoo school to in heber superintendent of construction I 1 for ralph E childs of Spring springvlue springville ville was david adamson other contractors were leland stephenson mt emmons plumbing and heating contractor and bowen and marvosh electr electrical leal contractor |