Show oil news tissue government no 1 located at NE NW NE sec 12 as coal basin was abandoned as a water well at ft according to official reports however tissue government no IA 1 A was studded in thereafter and currently Is drilling ahead at 1303 ft it at its location at NW NW NE sec 12 as george F martin tulsa okla and others are the operators and S D king and son rangely langely Ran gely are the drillers drillars dr illers equity oil co compi completed eted its ashley valley no 2 A well as a gas producer J L dougan president said recently he estimated production at cu ft dally daily this will be he used at the field the company bit hit an oil and gas show in the shallow en t rada formation at about 2027 ft plans for a time were to make a dual completion but these were revised later and the 2 A completed as a gas well only had completion of an oil on well wen been carried out the 2 A would continued on page 8 OIL NEWS continued from page 1 have been the first andrada producer in the ashley valley field where production if is from the weber equity currently is drilling in cisco southern utah the Keer McGee drilling concern Is moving to riverton utah according to eddie baxendale local supervisor supervisor mr baxendale gald said he e was not certain when or if 1171 kerr mcgee would return to the local area at carters bluebell unit no I 1 located SE NE sec 8 6 IS aw drillers drillars dr illers are down near the friot mark A coring was taken I 1 at between 86 and feet recovering 17 feet of sand a and na 25 23 feet of shale A previous coring between anat teet feet recovered 7 feet of sand and 35 feet of shale the crew at jack burnett no I 1 strawberry valley la Is drilling abad ahead below 2400 feet its location Is SW SW 34 as I 1 no further operations s at the ute tribal no 2 S located NW SE sec 21 IS IE have been reported operations were somewhat delayed last week drilling work at the well is now virtually completed and the status of the well well as a producer should be known within the very near future the crew removed the cement plug from the well last thursday alky and on that day were laying wells by electric log the last good show shove reported was july 29 when a 6 hour test te between and ft r registered gist ered a ivery very strong bla blow W throughout and gas came to the surface in 1 hour 20 minutes the test recovered 2880 feet of fluid including ft of water cushion feet of drill mud and 2020 feet of oil |