Show sidewalks will be completed in ninety days by tho the successful bidders I 1 mellon ard wheeler of salt lake city cy aare successful bidders on the 4 miles of asphalt a sidewalks to be laid in vernal city this the arm firm id under tho the next lovi lonest est bid the work will start as the ne necessary cesary machi machinery pery can be as and will be completed by september I 1 about 50 men will be mp loed thin thio help will be secured e in this locality it if possible as agreed upon with the city council this amount Is slightly more than the city estimated about 30 tons of native nathe asphalt be used the construction of the walks will be similar to the pa paving in on the victory higham running through vernal with mith a 4 inch crushed rock 1 base I 1 IV inches ot of asphalt 12 inch hardening harden lne material presumably copper sulphate and dust the present walks aich be bel i in use about 25 years were ere on ground without any gravel base the new walks will be as smooth cement and will be ac at an all and driveways the new walks should last vernal for or at least SO years any re 1 pairing |