Show access road hoad dridge bridge planned for damsite bids for or both an access road and river bridge into dutch john townsite te have been called for by utah state road commission bids on the road will be received at the state capitol in salt lake until tuesday sept 16 10 at 2 p in when they will be opened the construction calls calla tor for a graded road beginning about miles northeast from greendale junction and about 5 miles in length construction will be on an equipment rental basas the project la to be completed in 75 73 working days sealed proposals on oil the table cable suspension bridge across the groen gren river will be received at the state capitol until tuesday sept 23 at 2 p m the bridge will have a 75 foot span and will contain cu ads of concrete M F B M of lun lumber and lbs ibs of structural steel this project also is to be completed in 75 working days Y P plans I 1 ans and specifications of b both th the road and the bridge may be obtained from salt lake or american fork cost of the road is estimated at and the bridge at tile the access road will begin at the end of the present new construction and continue to join the road into dutch john it Is expected that tile the bridge will be built about 1 miles upstream from tile the dam site at tile the measuring station it would handle one way traffic arid and have a load limit of about 12 4 tons due to the impoundment of water from tile the coffer dam tile the bridge would be e aboul abou 78 75 feet above tile water wafer |