Show thursday of this week was the day set act for opening the bids for digging the big strawberry valley tunnel the tunnel to be constructed will be feet long and will be a portion of a system for the diversion of about cuble cubic feet of water per second from strawberry river to spanish fork valley each of the bids ia istone to be accompanied by a cerbi certified fied check for aa a guaranty that the bidder will if successful promptly encute a satisfactory contract and f a bond in the sum of 1500 for the faithful performance of the work the contractor receiving the award must begin work promptly after the signature of tho the contract by the secretary of the interior the work to be completed before the fifteenth day of june 1908 |