Show ESTIMATED COST OF IMPROVEMENTS The total cost of improvements in said proposed Special Improvement District as estimated by the City Engineer is of which the will pay and the State of Utah will pay cost of street lighting leaving a remainder of which shall be paid by a special tax to be levied Against the property abutting upon the streets to be Improved or upon property which may be affected or specifically benefited by such The property owners' portion of the total estimated cost of the improvements will be financed during the construction period by the use of Interim The interest on said warrants will be assessed to the property The estimated cost to be assessed against the properties within said District shall be by lineal front foot for each of the following Improvement Estimated Cost A. Curb and Gutter per front foot B. Five-foot sidewalk per front foot C. Twelve-foot sidewalk per front foot D. Drive Strips per square foot E. Waterline per front foot F. per front foot G. Street lighting per front foot improvements per front foot One-half of the estimated cost of per front foot for installation will be assessed against property owners on each side of the Property owners are being assessed for the difference In cost of acquisition and Installation between a line and an line plus cost of related fire protection One-half of the estimated cost of per front foot for Installation will be assessed against property owners of each side of the Where property on one side of the street is outside the city the City will pay for one-half of the cost of Installation per front The State of Utah will pay for all costs of supplies and materials for the street lighting Assessment is for estimated cost of |