Show INTENDED IMPROVEMENTS The improvements to be constructed within said Special Improvement District in general Include the construction of curb and gutter together with diversion catch culverts and other structures to control surface water along the improved streets within said proposed the construction of drive strips and the replacement andor installation of water and sewer fire hydrants and other related fire protection the installation of street lighting and various beautification and all other miscellaneous work necessary to complete the work in a proper workmanlike Without limiting the above general description of improvements it is intended that the improvements be constructed in the designated areas as A. Curb Gutter To excavate for and construct concrete curb and gutter with removal of existing at the following Main from West to south side from West to south side from West to south side from West to south side from East to south side from East to south side from East to south side from West to north side from West to north side from 50 West to Vernal north side from 25 East to north side from East to north side B. Five-Foot Wide Sidewalk To excavate for and construct concrete 5 sidewalk with removal of existing at the following Main from West to north side from West to north side from West to north side from East to north side from East to north side to south from West to south side from West to south side from East to south side from East to south side C. Twelve-Foot Wide Sidewalk To excavate for and construct concrete wide sidewalk with removal of existing at the following Main from West to 50 south side from Vernal Avenue to 25 south side from 75 East to south side Varied sections between 50 East to north side D. Concrete Drive Strips To excavate and install thick driveway approaches with removal of existing Driveway approaches will be installed at various locations as determined by each property owner along those portions of the streets to be improved E. To excavate for and install an eight inch PVC waterline and upgrade andor install fire hydrants and other related fire protection improvements at the following Main from West to East F. To excavate for and construct an eight Inch PVC at the following Main from East to East G. Street Lighting To excavate for and install a high pressure sodium lighting system of approximately 40 fixtures at the following Main from intersection of South and U.S. Highway 40 to East Beautification To install brick cast iron tree decorative sprinkling system and other beautification improvements and to prepare existing gutter and sidewalk to accept the same at the following Main from West to north side from West to south side |