Show Soil Survey V Work ork I Resumed In Uintah Basin John D. D Peterson supervisor of the soil arrived in Duchesne last week to begin work on the 1939 project His crew is working in the and Monarch section section sec sec- tion north of or Roosevelt at present it was stated This section will willbe willbe willbe be completed in about two weeks and the men will move to Ito Duchesne to work on the Duchesne river from Duchesne to Hanna All land In the Basin is being surveyed and typed The findings are recorded on aerial maps taken of ot the section last year Most of the tho north country was surveyed la last t fall faU |