Show Altonah Road Work York Is Stopped For Right of Way Yay Road work on the Altamont-Al- Altamont tonah highway came to a close last week end with the road completed with the exception of a few short sections where rights of way have not been completely settled Sufficient Sufficient Sufficient Suf Suf- gravel for these stretches has been crushed and is piled up awaiting completion of the road The gravel crusher was moved last Monday into Uintah county for road work there A smaller crusher is being set setup setup et up near the junction of the Upalco and Ioka loka roads and will soon be beat beat beat at work producing gravel to complete complete complete com com- the graveling of the Ioka loka lane During the past two weeks the state road crew has been busy working on the bench Bule Home road and has put this section section section sec sec- sec sec- tion in good shape with the exception exception exception tion of several new culverts which will be installed as soon as possible pos pos- sible This is the section of or road added to the system by the last legislature and is part of the Du- Du Moon chesne-Moon Lake road |