Show moffat lets third contract A denver dispatch says orman and crook of paublo I 1 ave been an awarded ardel the contract for grading the roadbed of tho the moffat line from arrowhead to irot hot sulphur springs a distance of about twentythree twenty three mile the cost coet will be about about men will be put to work within a week chief engineer sumner thinks the grading will bo be completed long before the time it june 1 next the beginning of this abla work wid mean that the moffat road to la soon to bo be over the hard bard places |