Show machine readied for timpe mills highway oiling the utah state road commis sion has received the new road oiling machine that will mix and lay the oil and gravel in one op aeration and they are at present adding equipment to it so that it can lay a strip 13 feet wide the machine is slated for its first use on the improvements scheduled on the mill junca on timpe point highway this highway is to be re oiled and widened to 26 feet the machine ah can be fed either ili by picking up gravel from wind rows or by dumping gravel into hoppers the oil is added mixed and than laid by the machine and as soon as it is laid the road is ready for one lane of braf fie fic will be closed while the ma i chine is laying the mix but the closing losing c will not be for long ion g for as a s stated before the new road ro ad can ca n be used immediately the road commission has allot ted another two years of first priority funds within tooele thoele coun ty on the secondary road leading from tooele thoele to the boulder sum mt on the juab county line con st ruction work is continuing on that highway with a wide grade which later will be covered with pit run gravel the work at pres ent will be completed about sep 15 this new construction Is from boulder to dunbar nine miles thence west to vernon where it joins the present highway in to boele |