Show San Sun Juan Highway To be Bid i Bids for construction of ot a road and bridge In Southeastern Southeast Southeast- ern Utah were opened Tuesday Feb 27 at 2 pm p.m. according to toan toan toan an announcement by C C. Taylor Burton director of highways Apparent low bidder on the project was Whiting and Haymond Raymond Ray Hay mond Construction of Spring Spring- vine ville who entered a bid of 1935 thousand The project calls for a road mixed bituminous surfaced road and a three-span three steel beam structure at Recapture Wash In San Juan county It will begin on State Road load No about way half-way between Blanding and Mexican Hat lIat and one-half one mile east of the junction with State Road No 47 It will extend easterly for 18 miles The project project project pro pro- to be let will be identified a as State Project No 1719 Some of the principal materIals materials materials mater mater- to be used for the job In Include Include Include In- In clude 97 thousand cubic yards of unclassified roadway excavation excavation excavation tons of bituminous material 19 thousand tons of gravel and cubic yards of Class A concrete The project Is to be completed completed completed com com- In working days Mr Joseph Q Adair with offices In Price Is district engineer engineer engineer en en- for the State Highway department In this area |