Show Cane Creek Resumes Operations Castle Valley to Run Casing Operations have been resumed by Cane Creek Petroleum on the well on Cane Creek dome 15 miles mUes below Moab on the Colorado Colorado Colorado Colo Colo- rado river A string of 7 inch casing is being run to bottom at around 2200 feet and the well will be deepened to feet if necessary to reach horizons at around and f feet t which showed oil product production on in In Inthe the pioneer Shafer well M. M G G. G Mason Mason Mason Ma Ma- son president of the company spent a couple of w weeks ks at Moab getting work under way Superintendent Superintendent Superintendent Super Super- J. J G. G Ross is in charge It was was reported yesterday that the casing had been run to Ito within with with- in a few feet of bottom I The Castle Valley well of the Grand RIver flyer Ga Gas Oil OU Is temporarily temporarily tem tem- closed dosed down awai awaiting arrival of a string of inch 6 h casing which will be run to eliminate caving formation The well is bottomed at near 1500 feet and has been cutting beds bed of hales that have been showing showing show show- ling ing encouraging signs of oil and gas Delford Taylor is f. again makIng making making mak mak- I ing hole at his well east of Cisco after closing down for tor the win win- ter He lie has cut 11 oil oU and gas shows how in less leu than 1000 feet but no commercial production Considerable Considerable Con Con- trouble with caving hole is being experienced |