Show WILL ERECT DRESSING ROOM AT GYMNASIUM the board of education at a meeting monday awarded to lee richey of monticello a contract to erect a dressing room for athletic teams in the rear of the star hall gymnasium mr bid was the lowest submitted and calls for a total cost of the building will be 18 by 20 feet in dimensions and will be of stucco finish the floor will be of concrete lockers will bs removed from the shower room in the gymnasium to the dressing room and additional lockers will be installed the dressing room will be connected ta the shower room in the gymnasium basement by a stairway |