Show road costs given final figures on the construction cost of the peters hul monticello federal aid highway recently completed in san juan county have been by the state road for the construction of this road a atal of was set up as follows federal aid county bunds lunds composed of state road tax raised in the county 15 and money located by the state from the gaso oe tax funds of the total fio however was transferred ro the construction cost of the road om monticello to the colorado line federal aid ironey was matched in the trading surfacing guard rail corrugated metal pipe box culvert and bridge and construction engineering costs counting to the county phout federal aid paid for ox cu lverts and bridges under a awen ty foot span and for prelim engineering bringing the total project cost to the sum named ja aday afternoon club was en last evening by mrs bryan this was the last meeting 6 chub that wm be held antu nex fall mrs ada darrow arrived this week salt lake city for a visit with r IT |