Show LATE developments OIL FIELDS 0 o MOAB OIL FIELD DRILLING REPORTS utah southern oil co prank shafer no 1 cane creek dome section 6 27 21 discovery a ell of moan district after pulling the pump rods last week to equip the pump tor overcoming the trouble caused by gas pressure pumping was resumed tuesday and after three hours of pump tog a valve broke necessitating a shutdown while waiting repairs pumping was again resumed thursday and it is believed everything Is in shape for making an extended tesi of the well by pumping continuously for a month or longer during the three hours of pumping tuesday the oil flow was brought back in about the same volume as it flowed during the preceding week when from to 1000 barrels of fluid were pumped dally over 20 per cent of which waa oil while mechanical difficulties are being met with in pumping these are being overcome and within n week or two it Is figured that the well will be a steady producer bif anywhere from to barrels of high grade clean oil continuous pumping tor several weeks may result in the well again flowing naturally by heads as it d when the stratum at 2025 feet was first tapped at which time the flowed a large quantity of oil over period of six months t the encouraging acme back of the frank shafer well and the practical certainty that it Is a permanent per manen producer has had a stimulating effect on southeastern utah oil activities in general the utah southern oil company will within the next ten days spot a location tor the second test well on cane creek dome to be located somewhere on the northern flank of the structure the company plans to get drilling operations under way as rapidly as possible using ou from he prank shafer no 1 as fuel company has a large quantity 01 drilling equipment of all kinds as well as casing of various sizes on the ground so that no delay will be experienced perien ced in studding spud ding in embar oil co alg six no 1 moab anticline section 34 25 21 pioneer well of moab district drilling at feet in gray sandy limey shale well continues to make considerable sid erable gas and a trace of oil utah southern oil co canyon no 1 east anticline section 18 41 19 operations resumed thursday with diamond core drill after weeks delay while waiting for repairs drilling tinder 1350 feet in lime boulder knoll oil gas corwe cor we no 1 boulder knoll structure section 17 34 25 well being straight reamed to bottom at 1950 feet ten toch casing will be carried to WV tor deep test sand the first objective should be at not to exceed 2600 feet texas production co shipkey no 1 sweetwater structure section 0 2714 27 14 bottomed at 1980 feet 10 hole water well now being drilled from which water will be pumped during winter months to prevent costly shutdowns through freezing 01 long water line which now supplies camp general petroleum paradox colo structure spotting location for fourth well which will be a flank test of the salt dome theory midwest utah OU refining no 1 hughes elk ridge dome section 30 40 19 bottomed at reel ana abandoned there hole plugged and casing being pulled drigun equipment will be moved to blanding and stored there tor the present union oil co of california utan state no 1 lisbon dome section 16 33 25 abandoned at feet rig and derrick torn down and being stored at location for the present company will probably drill a nank well to test salt dome theory as several very interesting oil ana gas showings were encountered in the salt beds teds penetrated on top of structure crescent eagle oil co well no 1 crescent dome section 4 22 19 shut down at feet hole has been making small amount of oil with or over three years mr and mrs bert stork left tuesday tor denver after spending six months at moab rr stork handle the trucking tor the union on company s well in lisbon valley |