Show Bids Bids' Opened On Proposed City Bathhouse se Bids on the general contract for tor th the construction of or the proposed proposed proposed pro pro- posed Warm arm Springs bathhouse were opened by the city commission commission commission com com- mission to today day Th They ranged from to on the first proposition which calls for construction of ot ashell a ashell shell of the pr proposed posed structure and from to on the second proposition n. n which I calls cals for a shell shen with insl inside e plastering plas plas- I Neither Keither proposition provides for I heating electrical tile work or excavating these divisions of the construction work having been I omitted by the commission because because because be be- cause it was stated that funds I were not sufficient to carry on the work The excavation Js ds is be being being being be- be ing done by the city at present When it was decided to omit the I heating and other parts of the I work from the general contract contra t It ItI was decided to build as much as I possible of the building at present present present pres pres- ent and to complete it when funds are available The city recorder was authorized authorized authorized author author- to advertise for bids on the construction of street lights similar sim sim- ilar to those on Main street for forState forState forState State street between South TemP Tem pie and Fourth South streets for Cor Third South between West Temple Tem Tern pl pIe and Second East and for Fourth South between Main and State streets The three new lighting districts were recently formed by the city commission and the time for protests protests' against the formation ended today |