| Show I ITO NEW POWER PLANTS TO BE READY SOON EUREKA Cal Cat Sept 5 The The two Hat creek power plants of tho the Pacific Pacific Pa Pa- Gas and Electric company on the Pit river will be ready for tor operation operation operation op op- op- op within a few days according to Information received l here The wires connecting this plant with the power lines which will carry the current to points around Eureka Eureka Eu Eu- reka harbor are arc being set up When this Is completed the water will be turned clown down Into the thc big bi turbines turbines tur tur- tur- tur bines hines and tho the generation of electricity from Crom the new plants will begin |