| Show r 1 F DADS DE I Disagreement as to Details ta ls Is Cause I j I Utah is the tho lI state In the Un Union on I In which federal aid road projects com coal I I 1 have net have ha enot not been completed This 1 statement t was made to the tie ro road d commission cornI corn com coin I I f mission today by Dr I. I IO LO o. o Howes Hewes of the tto bureau burrau of ot public roads v who o with I lw W W. H. H Lynch Lynch and B. B J. J Finch conI conferred conferred con con- with tho the commission on federal aid old road rond projects I Tho The state slate commission was informed r that the tho four tour grade crossings of the tile I highway in the tho town of ot Salem over I which there has been much contro- contro I wrt ery and which has has resulted rC in de delegations dele c- c I 8 calling g upon the must be be eliminated Tho The four croes- croes i hJ ings are within a distance of ot one and quarter one miles It was pointed outI out I to commission that unless this was done clone th the government would not aid aldi In InI I tho construction Uon of ot the road through Salem A A A. A new J line lIno no has hns been surveyed cd 1 I and approved by the government en engineers engineers en- en which h cuts cut out these hese crossings I i but in BO so doln doing cuts out ut tho the central portion of or the town from the tho highway r I The project between D chesno and nd Castle Gate was also discussed I and nd Ir It was as brought o out t that about worth of work on this road rond remained to be done and that this amount was was' as' as d due e on on the project ct from the tho govern govern- I- I j I Bids for or the construction of at t fur four ur urI w wood wood span span bridges on the highway be between e o- o I tween Roosevelt and Vernal were s scheduled t to be opened late this after after- noon I |