Show Hearing Reopened Cents I Proposed Gas M Meter Charge harge Tf TESTIMONY NJ T TO TOBE 8 BE OFFERED ItT AI Arn l Ar Petition to Charge 25 Cents on Meters Denied by Commission at Meeting Pending More Facts of the Utah A Gas and COKe company for permission to 10 institute a 25 cents ready to serve charge on all meters meters me- me heard before the public utilities commission October 10 1918 has been reopened by the commission and a hearing set for tor April 7 at 10 a. a m m. for the introduction ot of new tes- tes tesI I Tile The new evidence to be Introduced introduced In- In Is the operating expenses ot of the company since the last Increase went Into effect The case Is reopened upon motion ot of the commission and by stipulation ot of both parties The order ot of the commission handed I down following a decision ot of the case last October directed the gas company to male make and file within two months a physical valuation ot of all property used and useable in the production and distribution Qt of gas and the commission commission com com- mission retained jurisdiction ot of the case until such time as the result ot of the present rates Is fully determined and the physical valuation ot of the petitioners petitioner's petitioners petitioner's pe- pe plant and equipment is made The petition to Institute the 25 cents ready to serve charge was denied by bythe bythe the commission pending determination of the result ot of operation under the thelast thelast last increase granted It Is to deter deter- the result ot of operation under the present rates that the rehearing Is ordered Prote Protests ts against the granting grantinS' of the Increase were lied filed with the commission commission commis- commis sion by Salt Lake City the Ladles Ladies Literary club and private individuals |