Show UTAH Smelter II 1 Net et of C R it Month According to tf the Boston Dolon Journal tIme the of the Utah Consolidated com company pan which owes high highland land hey Doy mini mine lit at end the Iho smelter neat near Murray have hae issued n a brief report to the lie as ol toW lows When the tho management as lIum d control In April last there theN had I been deelo Id by means or of Nos 4 5 and 6 three distinct bodies or of copper ore ure estimated to eon con tam 6 OOOO tons lons SinN Since that tune time In addition to I systematic crOl crosscutting of c the existing ore oro bodice work ha has been vigoroUsly pushed on tunnel No 7 which is 19 feet teet blow below tunnel No 6 with the object or of the exIstence and extent or of orthe the ore oro bodIes bodie on that level In September last ore body No 1 was U struck In tunnel No 7 1 and crosscut crosscutting ting Is IA now beIng Inc carried on tode to dc its area and the tunnel Is also being carried forward to determine the tho existence otoro of ore NOli No 2 rind 3 orem From developments made since April last It in 19 safe to It at present upon thol In the mine or of tons lons of copper o ore or of ore oro have been n macia tron th mine mineto to the since last May The rhe existing ant and equipment nt at the mine are inadequate s so plans have been made for tor a now new power house upper tramway terminal coat pockets freight elevator cleator and shops which with th the necessary machinery equipment will cost about When there theft nt are I carried out the will 1111 ho hI In n a position to mine and Ind handle Its ore oro more economically than at al present The pelt 1 in c In the thc last Or of 11 May a anti tte mst two montha or of tit opera operation lion the tho Usual trouble In starting a now new plant tras ex CX It was found Cound that the en ca ot of the three furnaces watt on In of the three Ihl so 0 a 0 fourth furnace ia 16 no now being built Complete have for tor doubling th the present smelter cape city This will ani only the building or of three or four more sever ra tor I with Ith th the I apparatus and th the addition or of two stand as the smelter as it Il Is now built Is with 1 power Ower Ill Plant nt or of to take care of double the tonnage No o new buildings will have hae to lo I Ie simply extensions of those which are at existing ThE total cost ost or of this enlargement of the plant will l be op Our Diant Is th the most mod rd era orn In existence In the United States today The mechanical handling or at atthe too the ore and products bam Ix been n carried out to perfection and on account or of orthis this high excellence ot of the d the lbs expenditures for Cor labor fuel ruel and sun plies are reduced to a minimum The following summary of rul is b from Crom the time Was al put nut In comm ollon UP to and In No Nov 0 m isoo Al baa been alI above 01 the dill nut no et Into Inlo regular nanning order until JUly 1 the time or of Its blowing In until No Nov 30 the tho total production ot of line fIne copper was Gross Oro from soles of copper silver and SUU expense nt at mino ant and smelter nil expenses or of rop copper r such as freight cOIn missions and ex expense ln 5 not Income |