OCR Text |
Show olldated WtU be hurrted to comfnetlon Just as fast as conditions will permit. Before Be-fore these buildings have been completed the equipment will be decided upon, and will be ready for Installation as soon as j the structures, are made ready for the reception re-ception of the mill, that Is to have a capacity ca-pacity ft not less than Woo tons dally. Borne idea of the proportlona of thla plant can be gained from the staterAsnt ,that the plans for the buildings and trackage at this mill require the use of1 I . ','n c"fa of ground, and yet it Is ornclally-nnounced that the first unit will be made ready for the reception of ores not tater than the close of the year. CONTRACTS FOR UTAH CON. Contracts for the grading, as well as tie immense structural Iron work of the i ,mmoth reduction plant of the Utah c ,,. isniuiated, nave been let. according to h .uoment given out by Manager -Jack-- ai'l the work on this section of the l' that is being constructed .lust be-j be-j the proposed site of the Boston Con- |