OCR Text |
Show U. L. & R. AT WORK LAYING DOUBLE TRACK Construction gangs are at work lay In double track for the UUh Light and Railway company on the Fourth South and Penitentiary line, from a point a few rods above Eighth East street to Ninth South street - on Seventh East street, where the new-section will connect with the double tracks that have lontf been in use, and the line will then be doubled tor almost Its entire length. There is a stretch of single track on this line, a half block in length between Fourth ana Fifth East streets. This piece of track will probably be doubled within a short time. The crossing at Seventh East street Is still single. bi;t It Is probable prob-able that this will also be changed soon. |