OCR Text |
Show no decision on TERflALBIDS Contracts Probably Will Be Awarded Monday awarding ofcontraeta for th enn sTruvtion of "a new-interurhsh terminal termi-nal station on the eouthweat corner of 8outh Temple and West Temple atreeta was deferred Baturdsy afternoon after-noon by officers of the Bait Ijike Terminal company until Monday. The action waa taken, It waa explained, to permit tahulatlon of the figures involved in the bids. A total of eight Mds by reperal contractors were received and opened at the meetlnc held In the offices of the archttecta. Youne; and Hanson, In the McCornlck bulldlna. The total coat of the structure Is expected to be between 1200,000 and fl&O.OoO. flpeclicationa calling for a foundation founda-tion and framework suitable for a six or eight story building, but the building luelf to be only two stories, were supplied all the interested contractors. con-tractors. The purpose In this Is to sMow additional stories to be' built when conditions demand, according to a statement made by W. C. Oram, president and general manager of the Hult Lake Utah railroad, which, with the Bamberger Klertrlc railroad, will utilise the station faculties. The building wlH have a frontage on South Temple street of. 114 feet and on West Temple street of ninety-two ninety-two feet. The main entrance will be on Bouth Temple street. The basement base-ment apace will be ailoted to expreaa and baggage rooms, accommodations for employes, train dispatchers' and telegraph operators' quarters. The second and main floor will be divided Into waiting rooms, ticket offlcee and admlnlstretive offlcee of the two railroads. rail-roads. Plana to have the Salt Lake, Carfleld Western railroad, the Halt-air Halt-air route, utilise the terminal station were abandoned definitely . several weeks ago. |