Show TUNNEL FOR FORI LACUNA LAGUNA I IDAM DAM IS COMPLETED YUMA YUrA Ariz May 1 Shrieking king eking whistles and the cheers of enthusiastic townspeople and farmers announced yesterday the tho practical completion of the foot tunnel which is the largest unit and most important a adjunct of tho the Laguna dam damn irrigation tion project Tho The foot fourteen boro bore under tho Job Colo Colorado r rado liver which will carry water to toini ini irrigate ato acres between the Ule damn dam dama a and d the tho Mexican border was as driven to tho California side ido yesterday find and Engineer En En- n- n expressed the belief that water would h be him fI flowing wing through it by the tho middle of Juno June Fifty feet moro of the tho lower tunnel remains to be he excavated but this will win willbo bo bc finished in a a. week Then rhen all that win will remain to be bo done will be the tho removal of the tho compressed air locks tocks and drilling The tunnel was WiS le begun un last October |