Show STEWART STWART M MINE TO INCREASE OUTPUT T TO TONS ONS DAILY reports continue continuo to como from rom tho Stewart mine at Ida lda and at the pres present nt rato rate of Trod production with wIh no indebtedness to carr carry thoro thero thorois is every reason to beH believe vo that the dir directors will ii declare n a dividend wi within t n the tho next few H. H I. I B E. E Holt rolt chief chic chie engineer of or thoI tho C Chicago ioa Milwaukee k I o Pl t. t Sound Soum railway who mado an au examination o otho ot of tho the Stewart mine last Jat week reports report that he found an oro ore showing j in iii nearly ev every ry portion porton of tho mi mino 0 that he via vis il Hod about time the Talking about property he hc said taid In t In the shaft between tho the upper am and lower tunnels which arc about feet fee anc apart there is is oro ore every e loot foot oot of tho the w way v and several drifts loading from rom th the tho shaft ali also o are in ore arc tho the deposits deposit having been een encountered in places place where it was believed that thorn there wa was S nothing but barren baren ground In n the tho ol old tunnel on tho the foot level which was WM thou thought ht to have havo b been on worked out long a b there was recently discovered Inan Inan in inan an upraise an nn extensive body of tho the heat ore over ever f found unc in the mini C Corn Com r. r pet nt ra who ho have hac examined the property during time the te paa past t fow few weeks de tie clara claro that tho the Stewart will wi develop into one ono of tho the heaviest producer in tho the d dAlene Alene district and that it will wil wH take years of extensive mining to exhaust ex cx- han haust t its is ores I Superintendent J. J E. E Beaudr Beaudry Beaudy stated that the mine mie was shipping 50 tons tens of ore a R aday d day fifty tons tonof of which is bein being sent Font direct to the smelter ant and tons ton to tho the Mammoth c concentrator tor at Wallace Ho stated that he ho ox ox- eX to increase tho output to 75 tons ton a day dav in the tho near future I TIme Tho The or ore oro is i snow now being taken out ont o of the mine through the lower Jover tunnel for forthe forthe forthe the operation of which an electric transportation trans trans- n system has been installed Pom Prom From tho p portal of ol tho tunnel it is in b being be be- iD jog ing Carried carried carried to the Oro Oregon on Railway Hanway Navi Navigation tracks by r a gravity tram tran aton haiD having a capacity capach for carin carrying 2000 tons a ada day The Tho operation of or the tho cloo eloc- trie tic tram train has haR redu reduced d the operating ex cx- pauses pauses' of the tho Stewart company compan b hy by about abolt OO a d day y be besides ides ides' increasing the tho oro ore handling facilities |