| Show PLANS FOR BLANDING RESERVOIR RE READY bY Plans for a reservoir to to-be to be built built by bytho the tho White Mesa Canal company two miles north of Blanding San Juan county have have been submitted for the approval of George F. F McGonagle state engineer by Caldwell Richards engineers en en- The reservoir wl will have a n. ca capacIty capacity capacity ca- ca of 14 6 acre feet Its area will willbe willbe willbe be 33 acres The water for the reservoir will bo be received from an irrigation canal owned by tHe company and which is connected with Hallet creek The Tho water water wa wa- wa- wa II ter tel will wll be used as part of the domestic domestic do do- supply in the tho Blanding waterworks waterworks waterworks water water- works system It is proposed to build a dam which will contain about cubic yards of earth fill Th The project will involve an of several thousand dollars dollar arl I |