Show I Moffat Tunnel Is Near Completion Hitchcock Says The Moffat tunnel Is nearly 80 SO SOper per cent completed and we hope to have it finished before the specIfied specified fied tied time which is July 20 20 1927 declared F. F C. C Hitchcock president of the Hitchcock Tinker Inc of Denver Coo Cob who arrived here Wednesday evening with Julian Bamberger president of the Bamberger Bamberger Bam Bam- berger Electric railroad and vice president of the Salt Lake Denver Denver Denver Den Den- ver line Despite the many difficulties that have been encountered while working on the tunnel the east side is half halt completed said Mr Hitch hitch- cock He declared that on the westside west vest westside I side they have struck many difficulties difficulties such as boring through soft son rock By all means the Uinta basin should have a railroad he com corn The basin Is a wonderful I country and has a great future I There will be a road through there therein I in time When the tunnel is completed the Denver Salt Lake road will wiil no doubt be the company to use it according according according ac ac- ac- ac cording to the visitor The tunnel will vill I be le e the longest In the country and fl frill iII have a single track Mr l Bamberger had been in Denver Denver Denver Den Den- ver and through the basin He In Hein in- in the tunnel |