Show Board Takes Bids For Building Of o East High Gym Low bids totaling for construction of a brick and cast stone gymnasium at East high school had been accepted Saturday Saturday Saturday Satur Satur- day by the Salt Lake City board of education on building committee Dr M. M Lynn Bennion city school superintendent said construction will begin next week Bids were accepted during a committee meeting meeting meet meet- ing lug Friday afternoon Chytraus Brothers Co w was a a awarded the general contract on ona ona ona a bid of oC James Plumb ing and Heating Co will vill install facilities on a bid of and Bowman and Marvosh will ilI do electrical electrical electrical elec elec- work on a bid of Dr Bennion explained that plans for the structure which will re replace replace replace re- re reI I place the present boys' boys gym were I drawn by and Mac MacDonald MacDon- MacDon Don DonI I aId ald architectural firm to cut costs the building building build build- ing will include a playing floor i with two practice courts seating I capacity of 2500 for aU athletic events shower and locker rooms two VO classrooms for health classes and two shops which will be used for radio electrical wood and metal work I |