Show PROJECT SPEED SOUGHT Prompt construction of ot the Great Salt lake project was seen Thursday by A. A S. S Brown chairman of or the special chamber of commerce alunite committee as the only answer answer answer an an- Utah has to competition offered offered of of- by the Bonneville dam in Oregon Oregon Ore Ore- gon cs as s a site He for a plant planned by bythe bythe bythe the Bohn Aluminum and Brass cor cor- An metallurgical electro plant needing cheap power is planned by bythe bythe the company for the reducing of alunite from southern Utah fields to aluminum If Jr action is taken immediately to convince the Bohn company that Utah is serious about diling the Great Salt lake Mr Brown said company officials will seriously consider consider con con- sider skier putting the plant here At present pres ent eat the most pl plausible site is near the Bonneville dam He pointed out that it will require at least two years to complete the Bonneville dam If Utah acts Immediately immediately im Im- Im mediately the project can be completed by that time he s said ld Governor Henry H. H Blood under an m act of the last legislature is empowered empowered empowered em em- powered to name a commission commission commis commis- commis sion and get the project under way |