Show i Mining Financial Commercial News I 1 LEHI ii TINTIC MINE WILL RESI RESUME WORK JORK Work will be resumed March j 3 on the contract for drifting feet on the main tunnel level of th the 1 Lehi Tintic Mining company's property property property prop prop- erty in the Tintic district officials of the company announced Monday The work worl was started last July but l was interrupted after drifting had progressed feet The drift starts at the end of the theold theold theold old main tunnel which is in 1400 feet It will cut the Lehi Tintic and Gold Blossom fissures in both of which silver-lead silver ore has been encountered encountered encountered en en- countered before The Gold Blossom vein never has been tapped between tho surface workings which went down feet and the foot 50 level JI below the main tunnel Between these points are 1200 feet teet of undeveloped undeveloped unde unde- ground Abner Gray formerly of Eureka is fg doing the work on a contract granting him a years year's lease on any ore discovered in tho course of de de- In preparation for expanding operations operations op op- op- op the company compan last week in installed installed in- in stalled an engine and compressor in-I in |