Show pr pring j Floods Will ViII WillBe r Be Test rest for Dam Darn Dame i Tb The e spring flood season when the lorado river becomes a raging tor tor- at atwith with a flow often as high as iSO iSO- 0 G water per second will be bee e tr test of f the success success of ot the over dam according to E. E O. O Wat Wat- director director of the Six Companies builders of the dam darn Mr W Wattis left Salt Lake Friday r. r LoJ Angeles after having spent l day with his family at atI 1 I Ogden Mr fr Waltis Wattis said the success of the feat in hi the construction the dam will be determined ed beem be be- em een em now and March 1 1 L Two wp large one above and one be be- the ite of the main dam are be be- constructed to divert the waters the Colorado while the main dam being built out our Jarge larg rge division tunnels two e each side of the canyon arid and e each cach c fe feet t In diameter have been con con- i and are arC in readiness to carry t of ot water per second if occasion casion arises Seepage has been vented heated in the coffer dams by ruband rub- rub and ud sheets sheets' of metal fastened to 1 lining of ot the d darn dam m. m |