Show I GRANITE ANITE HIGH 1 SCHOOl SCUOL SETS GETS IMPROVEMENTS Construction of a new boiler house changes and additions to the gymnasium slum and an nn addition to the science bui building of the Granite High school have been approved by the state school buildings commission In the same district an addition i ito ito to be made to the Sherman building COD consisting of ot four classrooms a new boiler house coal and fan room on the ground floor and and toilet rooms and andI heating chamber for the ventilating system on the second floor The commission commission com corn I mission has approved the following additions and improvements to school buildings I Heating and ventilating system for II III the tho Roosevelt High school Duchesne county school in Peterboro Cache I I county addition to the Blaine Elaine school Granite district sixteen-room sixteen grade 1 school building In the Beaver county I II school district heating and anti ventilating I II I system for the grade school I I lin In the Davis county school district I I |