Show I INOT GIROUX CON WILL NOT SINK DEEPER 4 i The Gh shaft hat has been ben cleared of ot W water t l' l practically to the bottom and the ther r ll debris which accumulated during the Jl months that the mine was wa flooded has ha Jn ern cl away heaving Jea the mine In ln practically tho tilo same condition as 31 It was as before the lire fire Ore Manager Mills MI states tates that sinking in In the bl blK shaft bac will wil not be resumed at present but that the compans company's com corn pany's pans forces will wil be he concentrated concentrate in getting petting pet get tn ting the Morris shaft Ahan and workings In shape hapA for o production before May I 1 at which time tic the company Is Js under contract con Coil tract trad to begin d deliveries of or ore to the Steptoe smelting plant of or the Xe Nevada Xea a l Consolidated Giroux Is no now pumpinG about aboul of or water ater a a da day from th th maln shaft Khat lat an and the lie Jound ground between th the I 1200 OO and foot 1400 levels le Is being r very slowly but steadily drained of or water Wh When n the lire tre re occurred last AU Aug It a al crosscut l cut was being driven on the 1400 toot foot tot level toward the Alpha Alpha ore hod body lody but progress was ns very ver slow on account of or the tho great volume of or water that was as encountered When the round ground above f abo the 1400 foot J level Jel el shall shan have been cleared of o water watt tho the er crosscut can call casi easily be 0 driven Into Alpha Alpha territory with wih a much less ies 1 ss l of or time and monc money than would be required require under tinder the present con con- |