Show RESUME WORK AT FLOY TEST T I Sandberg Petroleum Co 4 Project Search for Oil Oi Structure 1 on n Utah X The e erg Petroleum company com com- pany n ny has resumed resume drilling Us Its Is oil 01 teston test on the Floy Foy structure which Is north of the Crescent Eagle Easle test si according to word received here l receive Saturday by C. C A. A Vincent a former for for- mer mer official of the tile company from VR I R. R RIchey general manager of the thc company who Is In Los Ls An An- geles Drilling was stopped about three years jears ars ago due to lack of funds but the company now is reported to be betuU tuU fully financed to put the hole down downto to the tIle objective sand which is es estimated es es- to be at a a depth of feet feet The Tho hole now flOW noW is about 2600 feet deep 1 J J. 3 j P. P Smith who is to have charge of ot the drilling is en route to Salt Lake Lake Lake from California and the tile crew cres has been sent to tho the test by byway wa way of Green River |