| Show Con Contract Let for Laying Pip Pipeline line Contract for the laying of t two o and one-half one miles of or water pipe from the upper end of 01 Slate canyon which will connect with the lower part of ot the water system of ot the State Mental hospital was let Saturday Saturday Saturday Sat Sat- by the trustees of the hospital hospital hospital hospi hospi- tal to the Wheelwright ConstructIon Construction Construe Construe- tion company of Provo at a cost of The Tho reservoir and the lower part of ot the system will b be constructed by the patients of ot the Institution |