Show PERTINENT PERTINENT QUOTATIONS I r from other pages of Dean Jean Taylors Taylor's Engineering Report CONTINUE AS AT PRESENT This shows an overall cost of or per Kwh including generated energy purchased peak energy and standby capacity At present the amount of energy energy ener ener- gy being purchased is about equal to o the generation t INSTALL NEW 1000 KW IW UNIT N New w unit could carry base load but sufficient gas would lot liot ot be available to run unit 7 to capac ity ity- Cost figured by two different methods for base load energy generation generation gen gen- plus additional costs for peak energy and standby capacity ring the total cost to the same figure of ol per Kwh This pro pro- osal would require another unit uniti In In i about three years This would have to be financed at least in part by another bond issue and would likely make the cost per much higher T 1 TIt It is assumed that the proposed new 1000 KW engine would have first priority on the total ga gas supply This will not leave a sufficient sufficient sufficient amount of gas Kas for full operation opera tion of present Engine 7 and none for Engine Nos 5 6 and 6 The latter two engines will not operate on oil and therefore would be shut down do and be useful only for emergencies or standby Y The rhe 7 Engine ng has been re- re re converted to use natural gas This unit seems seema to generate about KW If If this were were placed on the base load it could genera generate e about 40 of the present using 70 of f the present allotment of g gas s. s The TIle operation of of this unit seems to have been very uneconomical uneconomical uneconomical under oil as fuel per gallon as shown on several reports It seems unlikely that any more gas will be available as in the last 14 years industrial gas has been available only 8 months and then in limited quantity |