OCR Text |
Show HEATING JOINT BUILDING P. J". Moran Awarded Contract for Repairing Re-pairing Present System. P. J. Moran was awarded a contract by the Joint board of control of tho city nnd county building yesterday for Installing In-stalling a Webster system of heating at tho Joint building. The contract price is J5775. Tho work will be in tho nature of a. ropalr or relnforcemont of the present hot-water system, which has been found defective and Insufficient for tho purpose. Tho preacnt radiators will be used, but additional pipes will be put In so ns to drain off tho cold wator. which will bo carried back to tho heating plant to bo used again. |