Show MATERIAL FOR NEWHOUSE Local Representatives Go East to Place Orders for Its Delivery There is to be no delay in the equipment equip-ment of the Newhouse mines at New liouso In the southern country and to dispatch it Messrs A F Bottles and Joseph Dederlchs are now on their way to confer with Eastern manufacturers that the delivery of structural material may begin at the earliest moment possible pos-sible The first order to be placed by them will be for the massive Iron pipe cnpabl of resisting enormous pressure and to prepare for it a grading outfit has been started for Newhouse with instructions In-structions to proceed on the work without with-out delay The undertaking throughout will Involve very great tonnages of material ma-terial and the southern division of the San Pedro will during the next few months be called upon to handle the largest volume of freight since the extension country ex-tension of Its rails into the southern |