Show NEW UNITARIAN CHURCH I Work on the 10000 Modern Building Build-ing on Second East to Start Monday Morning The excavation for the new Unitarian church situated on the west side of Second East between First and Second South has just been completed and the masonry work will be commenced Monday morning The building is lobe lo-be of light pressed brick and stone 43x 33 feet one story and basement and will cost 10000 The main auditorium will have a seating capacity of tOO with two large rooms at the rear opening Into the main auditorium by folding doors On either side of the pulpit will bo a large room to be used as the pastors pas-tors study and a parlor In the basement will be a dining hall 27x40 feet a large kitchen two large parlors cloakrooms Janitors rooms etc The building will be well ventilated venti-lated and heated by hot air George H Raybould Is the contractor and builder and the specifications call for the completion of the building at the earliest possible date Work will be pushed as rapidly as possible and It Is believed it will be ready for dedication 1 dedi-cation in the early fall The Unitarians of Salt Lake are rejoicing over the prospect pros-pect of having In the near future a building pf their own for the first time since the organization of the society some thirteen years ago |