Show r Progress on University Buildings Contractor Honey of the new University Univer-sity buildings continues to make progress pro-gress on the east bench Flrsttloor Jolsui nro being placed In position In I the library building the basement walls of the physical building are being run up and faced with pressed brick tho I Kucoiuliloor Joists are In position on the 1 normal school building and the boiler I house and tunnel are aboul completed The new luiidings It ill njreudy mnklng a good t how and when completed will I make an impressive appearance from the oily Th1 contractor has Ijepu delayed de-layed b > a shortage In rtone but Is now able to do better |