Show I TROPIC EAST FORK DAM I I Cost of the Improvement Estimated I at 825000 i I Engineer T P Rlgney is pushing plans for a dam for the Tropic East i Fork Irrigation company on the cast fork of tho Sevler river The cost will I be about 525000 and the reservoir will Irrigate 15000 acres of land The projectors i pro-jectors of the enterprise propose putting put-ting on 100 to 160 teams to hurry things through The dams capacity is put at 160000000 cubic feet of water The former I for-mer dam went out with 0 flood and an this enduring time the basis structure will be built on |