Show BATTLE MOUNTAIN NEWS special correspondence battle mountain nevada april 10 at the little giant mine work is progressing along steadily the last shipment of ore assayed silver ounces per ton 4 per cent read lead and gold manager lee reports the test by the holderman filter process on the milling ore to have been very satisfactory the extraction being 93 per cent of the gold and 86 per cent of the silver A plant for the treatment of the ore is very probable in the near future eads and wilson have brought in some good looking copper ore from a new prospect on elder creek samples fro from m a five foot ledge found within three miles of berlin by treat and bartoo show coarse gold all through the rock and will assay up in the hundreds A surveyor is surveying the claims and a force of men is doing the locating work at the mines of the old humboldt company the lower tunnel is being driven ahead the vein is five feet between walls and well mineralized preparations are being made to put on a large force of men C CS S |