Show TWO ARIZONA propositions ARE NEARLY READY TO BEGIN SHIPMENTS by will C higgins los angeles september 10 A purn pumping ping plant has been installed stalled in the of the old selman mine near superior arizona owned by the pacific lead silver mines company of this city and sinking has been resumed from the foot level with the inte intention antion of sending out laterals literals late rals en a depth of feet is gained for the purpose of prospecting and promising ledges from a number of paralleling that at station it is said is in a the bottom of the foot ody of primary or sulphide ore twenty two feet in width fron am wall to wall and all of commercial grade it is a and assaying up to 40 per cent copper 30 ounces silver and from 7 to 8 in gold to the ton ten feet of the vein it is reported is of excellent shipping value the balance constituting 1 11 al good mill feed prospecting from the foot level will be by means of diamond drilling 1 horizontally 11 orizon tally shipments are to begin shortly midnight test begins production the hoisting of ore has begun at the midnight test I 1 mine nine near prescott arizona according to mine manager W V W linesba in los angeles t purchasing additional supplies 1 lies and equipment and c conferring 0 nf erring with general manager W V H boreman the new hoist at the mine is now in commission mr linesba states and is in active operation raising and per ton gold and silver ore from the intermediate level above the foot station of the shaft where a new and important strike was recorded recently the expectation being that regular shipments of high grade ore will be bein begin 6 in before november 1 the 75 ton amalgamating mill on the ground mr linesba says is to be replaced by a ton daily capacity oil flotation concentrating mill for the treatment of large tonnages ton nages of better than 20 ore it being planned to have the new reduction works in operation within the next three months |