Show IDAHO the cedar creek mining company at wallace shipped a carload of 0 ore to the bunker hill smelter which netted a return of per cent lead and nine ounces silver per ton the blue star mining milling company in the coeur calenes dA lenes has resumed development and will add feet to the foot crosscut from the bottom of the foot shaft to reach the vein A new vein with fine ore showings has been uncovered by the columbus mining company in the coeur calenes dA lenes the vein is thirteen feet wide work on the pr property OP has been continuous for two years the monarch mine near murray shipped thirty eight tons of concentrates to the bunker hill smelter which returned per cent lead 95 ounces silver and per cent zinc the net for the carloads the Clarks ford copper company tear bear Clarks fork will sink to the water level ion to feet from a point on the vein where it was intersected by the tunnel the vein has been followed by a drift for forty feet two shifts will be employed raising is in progress from the main tunnel level of the nabob consolidated near kellogg the raise has attained a height of twenty feet and will be continued to the next level above which is feet higher than the main tunnel the work will be completed in six weeks directors of the silver standard mining company contemplate an early meeting at which they propose to let a contract for additional tunnel work on their property yin in mcfarren gulch south of osborne in the coeur calenes dA lenes they plan to let fifty feet feel of work at a time it will be done in tunnel no 3 which will give considerable depth the tamarack custer consolidated consolidate mining company in the coeur calenes dA lenes is producing crude ore and concentrates at the rate of tons a month the net value is said to range from to a ton the purchase of a tunnel that penetrates an adjoining property is under consideration the tunnel attains greater i cult custer tamarack depth than any on the and is convenient to the mill ore in in a body six feet wide has been dis disclosed by a diamond drill in the lipil L lead ead company callahan zinc property of the in the coeur calenes dA lenes it wa was s rescue reached and from the foot level of the callahan crosscut tiBb feet of can be opened by the presence arese prese drill suggests the core of the two of two and a half feet of lead silver ore the re and and a half feet of zinc ore der a mixture of lead and zinc froni from murr according to a report was Coni company panY the dredge of the yukon gold s raised last tuesday and is now riding n wd of the ta aurely on the placid waters sunk on dredge of its own making the bog ci follow day the morning of june 2 the the shutdown for annual repairs the was inae macu hine of raising the massive steel beed said to have na a difficult one and is est that aba accomplished within a period glad be r now lishes a record repairs will I be 1 and it is expected that the dredge beem weem in operation in about two or three will we if the ore widens and improves improve in the and was mashl make provision for sorting k to says ba shafto shaft ore as it comes from the COO bixby manager of the ajax minis mining hol pany at burke no great quantities lower t a a drifts ever will be handled until aror the level have been run to open up sink erty A hoist with capacity to feetham feet has been installed ore has c entire thirty five feet the shaft has forthe for the gone and is from six to twelve inches wide of better grade than previously encountered fourteen men are employed and work is being pushed rapidly the orogrande Oro grande gold mining company workings of the baltimore vein of the silver triumph mining company have recently been entered for the first time in thirty years ore containing 39 ounces in silver to the ton 20 per cent lead and 18 per cent zinc has been opened sixty feet from the surface the old workings honeycomb the ground on two tunnel levels the ore body between the main tunnel level and a point feet deeper is six feet wide and gives promise of a greater width development in several parts of the mine has disclosed that exceeds all expectations the callahan zinc lead company near wallace shipped pounds of zinc concentrates pounds of lead and ounces of silver in june the zinc production for june is comparable with pounds in april and pounds in march june lead production 2100 pounds in april and pounds in march and june silver production with ounces in april and ounces in march in the four and a half months of operation in 1919 the earnings from operations were and receipts from sale ot of stocks and bonds making a total ot of two dividends of 50 cents a share each have been disbursed this year the copper king mining and smelling smelting Sm elting 9 COTa company pany with properties at mullan has completed a raise of feet from the level the raise has been in ore cally from the beginning with only one wala all of the e vein in sight the raise opens oay y a small section and of the ore body conditions editions indicate that the ore body is ge hand sorted ore removed in the ourse of raising contained 20 to 48 per it lead and 10 to 20 ounces of silver to the e to ton the raise has passed through three ree heavy stratas of high grade ore the remainder binder of the mill filling is low grade feed all material taken from the e raise has been eel placed p city on oil the stock stack dump the quan of tons t milling g ore on the dump is 0 |