Show IDAHO the majestic mining company will levy an assessment to prosecute development on its property two miles north of burke the work will be done on the lower tunnel level development is proceeding on the foot level of the chicago boston mine on lake creek two miles southwest of wallace samples of the ore opened in the drift are rich in lead and silver the cedar creek mining and development company has resumed operations on its property in the murray section of the coeur dalene region A large body of low grade I 0 rade lead ore was disclosed several months ago the Hypo mining and milling company in the coeur calenes dA lenes has driven its crosscut feet or more it is expected to cut the vein at appoint fet ahead where a depth of several hundred feet will be attained twenty four tons of crude ore which the leasers leaders have taken out of the monarch mine above murray on the north fork of the coeur dalene river were hauled to the bunker hill smelter at kellogg giving returns of per cent lead and six ounces in silver the net value of the shipment was the idaho carbonate hill mining company with property near mullan has operated steadily since resumption on april 1 drifts are proceeding east and west on the foot level both drifts are in the fissure in which ore was discovered last year the west drift will be continued for several hundred feet to a point under promising disclosures at the surface and elsewhere which may be reached in two or three months thirty men are employed conditions are brightening for the copper king mining and smelting smelling Sm elting company at mullan according to H W ingalls manager the development is going some and looks good to me says mr ingalls all of the muck coming out is good milling ore and includes high grade crude ore the entire raise is in good ore and the only is in sight the width of the ore is probably thirty feet from wall to wall the high grade streak is about two feet wide and on the foot wall side the ajax mining company at burke announces a change in their plans of development drifting east has been discontinued and sinking from the shaft level will be c commenced om fenced A station is being cut preparatory to sinking and at this point there is one foot of good ore on the present working level ore has been found for feet of this feet is of commercial value A raise of thirty feet was made in this the ore continues but not as wide as on the tunnel level the nabob consolidated mining company has received returns on the first carload of lead concentrates produced by its mill on pine creek near kellogg the car contained more than twenty seven tons and had a net value of 2148 the net value per ton was slightly in excess of 77 the ore gre contained per cent lead and ounces of silver to the ton in addition to this lot the nabob consolidated had delivered tons of concentrates at the rail point for transportation to the smelter an extension of the tunnel was begun on may 1 and is proceeding steadily with two shifts ore is expected at a point eighty five to feet from the place where the work was started |